Medical Gas Products Installation

Medical Gas Products Installation
If the copper pipes and fittings, which are considered as the veins of the medical gas system, are not selected with the required quality, are not protected and are not installed with the appropriate technique, even if the specification of the gas supplied from the center is sufficient, the specification of the gas to be given to the patients will be impaired. Therefore, the design, material selection, installation and tests should be done as a medical gas pipe system, not a simple copper pipe installation. The stages of the medical gas pipe system to be built in the hospital are listed below.

 

Design

Diametering

Project planning

Selection and preparation of materials

 
Assembly
  Fasten the pipes with suitable clamps.
  Welding of pipes under inert gas.
  Labeling
 
Test
Cross Connection test
Leakage test
Compressive strength test
 
Commissioning
Fon Klima fulfills the implementation follow-up and implementation commitments of your medical projects according to the principles listed above.

 

Fon klima olarak sizlere hizmet vermek için buradayız, Medical Gas Products Installation ile ilgili daha fazla bilgi almak ve bizimle iletişim kurmak için aşağıdaki hızlı iletişim butonuna tıklayabilirsiniz. HIZLI İLETİŞİM BİLGİLERİ